1) no handrail up stairs - done. installed handrail.
2) no banister in loft - done. installed full length banister.
3) weak flooring in loft - done. installed new 1/2" sheeting across the entire loft floor.
Both tested and signed off by my workshop assistant.
Next up - lights (note placement and height of flood light on the pic on the left. perfect for branding foreheads ;))

